Chukha Dam Inflow Forecasting (Bhutan)
Jomiso developed an advanced Inflow Forecasting Model for the
Chukha Dam — one of Bhutan’s major hydropower facilities. The system was designed to
generate reliable inflow forecasts with a three-day lead time, significantly improving
operational efficiency and flood preparedness.
The model combines real-time hydrometeorological data, climate forecasts,
and catchment hydrology to predict reservoir inflows accurately. This forecasting capability
was further integrated with a hydropower forecasting module to support optimized power
generation planning and risk mitigation.
Implemented under a USAID-funded initiative, the Chukha project demonstrates Jomiso’s
commitment to advancing data-driven water resource management and strengthening climate
resilience in mountainous and transboundary river systems.
Project Type: Hydrological & Inflow Forecasting System
Funding Agency: USAID
Client: Chukha Hydropower Plant Authority, Bhutan